1 / 3
PURCHASE AT STORE ONLY
Adidas Evm004001 White
SKU: 043181142588
$79.99
WHERE TO BUY
Aurora 15139 E Colfax Ave
Get directions
Single-item inventory Let the store know you're interested before someone else picks it up.
Awards
protection
protection
Inspected
by staff
by staff
FREE
pickup
pickup
Layaway
available
available
Overview
| Model Number | EVM004001 |
| Manufacturer | ADIDAS |
| Size | 6 |
| Class | HIGH |
| Serial# | |
| Color | WHITE |
Condition
Good, pre-owned condition
Policy
| EZPAWN Shop With Confidence page | Shop With Confidence - EZ PAWN |
| Layaway Policy PDF | https://ezpawn.com/assets/pdf/Layaway-Policy.pdf |
| Product Protection Plan details | EZPAWN Product Protection Plan - EZPAWN |
Important information
DISCLAIMER
The photos shown are of the actual item. All pre-owned items go through our multi-point quality grading process to verify condition and functionality before they are listed. Minor cosmetic wear consistent with normal use may be present. Items pictured are examples only. Product may vary in store. See Terms and Conditions for more information.
IN-STORE PICKUP ONLY
This item is unique to the store location listed and must be purchased and picked up at that address. A valid government issued photo ID is required at pickup.
RETURN POLICY
If you return an item to our store within 1 day of pickup and the item is in the same condition as it was at the time of pickup, with all accessories, the purchase price will be refunded to the payment mechanism used in the purchase transaction. No cash refunds.
PAYMENT OPTIONS
LAYAWAY - UPTO 10 MONTHS TO PAY
Only 10% down plus application fee. Upto 10 scheduled monthly payments to complete your purchase. Visit a layaway policy details page for more information.
TAKE TODAY - FLEXIBLE LEASE
We partner with third party providers to offer flexible lease-to-own options with longer payment terms. Ask a team member in store for more information and eligibility details.
ADD ON
PRODUCT PROTECTION PLAN
Optional coverage available for purchase in-store at pickup. Includes in-store replacement or store credit for 6 months from date of purchase. Plan is transferable. Exclusions apply — firearms, jewelry, and items sold as is are not covered.
$79.99
Aurora 15139 E Colfax Ave · text or call back
